examples
short write-ups with two graphs each. copy the mdx tab — it is the framed figure. paste it into notion or a readme and the drawing is still there. each graph has its own page if you want the props.
refactor
You're moving auth checks out of handlers. Show the request path first, then the work in order, with the current week marked.
incident
p95 crossed the line, you rolled back a flag, and the postmortem is still open. The strip is the two days people felt it.
pick one
You're choosing a queue. Checks and dashes first. Bundle size only if that's part of the argument.
pull request
A review comment with a file list and a coverage slope. The reader shouldn't have to open the diff to get the shape.
this week
Monday stand-up. The track is the calendar. The numbers are what's in review, blocked, and already shipped.
migration
A backfill that's still running. The fill is the share. The figure is the row count, with the last points of the job underneath.
Give this to an agent: for agents. Install: skill. Every graph in one file, including the fenced ASCII blocks: /llms.txt.